Council Bluffs data center market

Power availability in Council Bluffs: DCPI verdict AVOID, composite score 31.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 208 words · generated 2026-11-08 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score31.9/100
MW, all listings1,110sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Council Bluffs at a glance

Council Bluffs has 850 MW operational and 60 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Google (910 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational850
Under construction60
Total listed910

Developers building or planning in Council Bluffs

OperatorUnder construction MWPlanned MW
Google60

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Council Bluffs

DC Hub does not hold a lease-rate figure for this market yet.

The market shows moderate consolidation with two single-facility operators (GABLE CORP and STREAMLINE UTILITY HOLDINGS) alongside the dominant two. Structural work on a 200 MW campus reached topping-out phase recently, signaling active construction momentum in the region.

This combination suggests that new entrants or existing operators seeking incremental capacity should expect limited availability and potentially longer lead times for power commitments in Council Bluffs.

No recent deals are tracked in the registry, leaving operator acquisition and divestment dynamics opaque. The stability of the current operator footprint—Google and CyrusOne maintaining equal facility counts alongside two smaller single-asset operators—offers no clear signals regarding consolidation appetite, expansion timing, or third-party capital entry.

Power supply tightness should inform any build or expansion planning for Council Bluffs over the near term.

Data centers in Council Bluffs

FacilityOperatorStatusMW
Google Cloud us-central1 (Iowa)GoogleOperational500
Google Council Bluffs Data CenterGoogleOperational350
Google Council Bluffs Building 5GoogleUnder Construction60
CyrusOne Council Bluffs IACyrusOneOperational
CyrusOne OCB1 Council BluffsCyrusOneOperational
Google Council Bluffs IowaGoogleOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Iowa.

More on Council Bluffs

Email me when the Council Bluffs DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Council Bluffs: 1,110 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/council-bluffs/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-08, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load