{"generated_at": "2026-11-08T05:24:29.103029+00:00", "key_stats": {"computed": "2026-11-08T05:14:54.418312+00:00", "constraint": null, "dcpi_score": 31.9, "excess": null, "facility_count": 19, "mw_reporting_count": 4, "name": "Council Bluffs", "recent_deals": [], "slug": "council-bluffs", "state": "IA", "top_operators": [{"count": 5, "name": "Google"}, {"count": 5, "name": "CyrusOne"}, {"count": 2, "name": ""}, {"count": 1, "name": "GABLE CORP"}, {"count": 1, "name": "STREAMLINE UTILITY HOLDINGS"}], "total_mw": 1110.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Council Bluffs", "narrative_md": "# Council Bluffs Data Center Market Brief\n\nCouncil Bluffs operates as a mid-scale market with 1,110 MW tracked across 19 facilities, anchored by Google and CyrusOne operating five sites each. The market shows moderate consolidation with two single-facility operators (GABLE CORP and STREAMLINE UTILITY HOLDINGS) alongside the dominant two. Structural work on a 200 MW campus reached topping-out phase recently, signaling active construction momentum in the region.\n\nThis combination suggests that new entrants or existing operators seeking incremental capacity should expect limited availability and potentially longer lead times for power commitments in Council Bluffs.\n\nNo recent deals are tracked in the registry, leaving operator acquisition and divestment dynamics opaque. The stability of the current operator footprint\u2014Google and CyrusOne maintaining equal facility counts alongside two smaller single-asset operators\u2014offers no clear signals regarding consolidation appetite, expansion timing, or third-party capital entry.\n\nPower supply tightness should inform any build or expansion planning for Council Bluffs over the near term.", "slug": "council-bluffs", "word_count": 208, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}