Council Bluffs data center market brief

Live · 0.2h fresh

Market Brief · AVOIDDCPI score pending · Live as of 75% live coverage · 6/8 sections

At a Glance 2 of 3 KPIs live

Operational850 MWsum of the sites that report MW; most do not
Pipeline60 MW
FacilitiesGlobal facility map
Queue WaitNot tracked
Top OperatorGoogle

Power & Grid 4 of 5 metrics live

ISOMISO
Queue Capacity13,477 MW
Queue WaitNot tracked
Reserve Margin18.5%
Gen Additions 12mo88 MW
Interconnect Pending262,506 MW

Pipeline 1 projects tracked

OperatorFacilityPowerStatusETA
GoogleGoogle Council Bluffs Building 560 MWUnder ConstructionNot tracked

Operator Footprint 5 operators tracked

OperatorFacilitiesTotal MW
Google5910 MW
CyrusOne50 MW
Edged1200 MW
CYRUSONE LLC10 MW
GABLE CORP10 MW

M&A Activity (24mo) Coverage building

Coverage building for M&A activity (24mo)
We will surface live M&A activity (24mo) data here as soon as our deals-tracker crawl returns rows for Council Bluffs. Full coverage typically lands within ~6 months of a market joining the DCPI.

Comps Coverage building

Coverage building for powered-shell and land comps
We will surface live powered-shell and land comps data here as soon as our transaction-tracker crawl returns rows for Council Bluffs. Full coverage typically lands within ~6 months of a market joining the DCPI.

Risk Factors 1 of 2 signals live

12-Month Outlook

Council Bluffs operates as a mid-scale market with 1,110 MW tracked across 19 facilities, anchored by Google and CyrusOne operating five sites each. The market shows moderate consolidation with two single-facility operators (GABLE CORP and STREAMLINE UTILITY HOLDINGS) alongside the dominant two. Structural work on a 200 MW campus reached topping-out phase recently, signaling active construction momentum in the region.

This combination suggests that new entrants or existing operators seeking incremental capacity should expect limited availability and potentially longer lead times for power commitments in Council Bluffs.

No recent deals are tracked in the registry, leaving operator acquisition and divestment dynamics opaque. The stability of the current operator footprint—Google and CyrusOne maintaining equal facility counts alongside two smaller single-asset operators—offers no clear signals regarding consolidation appetite, expansion timing, or third-party capital entry.

Power supply tightness should inform any build or expansion planning for Council Bluffs over the near term.