Power availability in Worthington: DCPI verdict AVOID, composite score 19.8 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 243 words · generated 2026-11-09 from live DC Hub data · DCPI live as of 2026-11-12
DC Hub does not hold a lease-rate figure for this market yet.
Worthington's data center footprint remains minimal, with three tracked facilities and a single operator on record. DataCenter.BZ, LLC operates the market's sole identified site. No tracked facility has reported megawatt capacity to the database, preventing a meaningful assessment of installed power density or reserve margins within the market itself.
Together, these metrics signal that new power procurement for additional or expanded facilities will face material headwinds. Securing incremental MW through new builds, power purchase agreements, or grid expansions is not assured and will require developer coordination with local utilities on transmission readiness and generation adequacy.
Deal flow into Worthington has been absent during the tracked period. No M&A or build announcements have been recorded. Operator concentration remains extreme—three facilities under one active operator leaves the market highly fragmented and offers limited insight into competitive dynamics or demand signals.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Worthington market data is live in DC Hub — cited and queryable by API or MCP.
JSON: /api/v1/markets/worthington/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-09, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load