{"generated_at": "2026-11-09T09:02:40.545236+00:00", "key_stats": {"computed": "2026-11-09T08:35:28.321760+00:00", "constraint": null, "dcpi_score": 19.8, "excess": null, "facility_count": 3, "mw_reporting_count": 0, "name": "Worthington", "recent_deals": [], "slug": "worthington", "state": "OH", "top_operators": [{"count": 1, "name": ""}, {"count": 1, "name": "DataCenter.BZ, LLC"}, {"count": 1, "name": "Unknown"}], "total_mw": 0.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Worthington", "narrative_md": "# Worthington Data Center Market Brief\n\nWorthington's data center footprint remains minimal, with three tracked facilities and a single operator on record. DataCenter.BZ, LLC operates the market's sole identified site. No tracked facility has reported megawatt capacity to the database, preventing a meaningful assessment of installed power density or reserve margins within the market itself.\n\nTogether, these metrics signal that new power procurement for additional or expanded facilities will face material headwinds. Securing incremental MW through new builds, power purchase agreements, or grid expansions is not assured and will require developer coordination with local utilities on transmission readiness and generation adequacy.\n\nDeal flow into Worthington has been absent during the tracked period. No M&A or build announcements have been recorded. Operator concentration remains extreme\u2014three facilities under one active operator leaves the market highly fragmented and offers limited insight into competitive dynamics or demand signals. Worthington, however, has not participated in these regional investment cycles, suggesting either insufficient infrastructure maturity or low developer interest relative to higher-capacity Ohio markets like New Albany, which hosts 1,815 MW across 41 facilities.", "slug": "worthington", "word_count": 243, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}