Power availability in West Jordan: DCPI verdict CAUTION, composite score 47.3 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 199 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
West Jordan has 175 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Novva Data Centers (175 MW).
| Status | MW |
|---|---|
| Operational | 175 |
| Total listed | 175 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
West Jordan's data center footprint remains small and operator-consolidated: six tracked facilities with Flexential operating three of them (two under the Flexential brand, one as Flexential Corp.), while NOVVA operates two sites under distinct legal entities. The market has no recorded recent deal activity, and only one of the six tracked facilities publicly reports its power consumption.
This combination means new power is available but obtaining it requires navigating real obstacles.
Operator concentration is notable: Flexential operates half the tracked base, and NOVVA controls a second facility under two corporate entities. The absence of recent deal flow does not indicate market dormancy so much as a discrete installed base with limited turnover or transition activity.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Novva West Jordan Campus Phase 1 | Novva Data Centers | Operational | 175 |
| Flexential - Salt Lake City/South Valley (SLC09) | Flexential Corp. | Operational | |
| Flexential Salt Lake City - South Valley | Flexential | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Utah.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
West Jordan: 175 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/west-jordan/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load