Novva West Jordan Campus Phase 1 is a data center operated by Novva Data Centers in West Jordan, UT, US. Its reported power capacity falls in the 100–500 MW range and it is currently operational.
Source: DC Hub facilities registry · Added , not re-checked since · Basis: cited (what this means)
Novva West Jordan Campus Phase 1 is one of 6 facilities DC Hub’s West Jordan brief counts on the WECC grid. The closest tracked facility is Aligned Salt Lake (SLC-01), about 3 km away, and the nearest mapped substation is within 5 km. Read the West Jordan market brief →
Published DC Hub data for this location.
DC Hub tracks 12 operating generating units totalling 1,880 MW within about 50 km of West Jordan, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Nearest first, by distance from this site.
get_facility slug="novva-data-centers-novva-west-jordan-campus-phase-1-b2c050c3" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect