Power availability in Richland Parish: DCPI verdict AVOID, composite score 32.6 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 256 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 32.5. The index is recomputed through the day and reads 32.6 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.
Richland Parish has 1,110 MW under construction and 3,890 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Meta (5,000 MW).
| Status | MW |
|---|---|
| Under construction | 1,110 |
| Planned | 3,890 |
| Total listed | 5,000 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| Meta | 1,110 | 3,890 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Meta accounts for 22 of the tracked sites—13 under the Meta operator name and 9 under Meta Platforms—establishing near-total control of deployed capacity in the parish. The market's power infrastructure reflects this concentration: all tracked capacity exists within a single operator ecosystem, with no recent deals recorded and no competing platforms establishing presence.
This combination—adequate base supply paired with delivery bottlenecks—creates a challenging environment for new facility siting.
Deal flow in Richland Parish has stalled. The absence of competing operators or acquisition activity reflects the structural challenge: available power does not translate readily into usable capacity for new builds or operator diversification.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Meta Hyperion Building 9 | Meta | Planned | 560 |
| Meta Hyperion Building 1 | Meta | Under Construction | 555 |
| Meta Hyperion Building 2 | Meta | Under Construction | 555 |
| Meta Hyperion Building 3 | Meta | Planned | 555 |
| Meta Hyperion Building 4 | Meta | Planned | 555 |
| Meta Hyperion Building 5 | Meta | Planned | 555 |
| Meta Hyperion Building 6 | Meta | Planned | 555 |
| Meta Hyperion Building 7 | Meta | Planned | 555 |
| Meta Hyperion Building 8 | Meta | Planned | 555 |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Louisiana.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Richland Parish: 19,500 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/richland-parish/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load