{"generated_at": "2026-11-07T09:22:31.506220+00:00", "key_stats": {"computed": "2026-11-07T08:49:35.380125+00:00", "constraint": null, "dcpi_score": 32.5, "excess": null, "facility_count": 22, "mw_reporting_count": 22, "name": "Richland Parish", "recent_deals": [], "slug": "richland-parish", "state": "LA", "top_operators": [{"count": 13, "name": "Meta"}, {"count": 9, "name": "Meta Platforms"}], "total_mw": 19500.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Richland Parish", "narrative_md": "# Richland Parish Data Center Market Brief\n\nRichland Parish hosts 22 tracked facilities totaling 19,500 MW across a market dominated by Meta's dual operating entities. Meta accounts for 22 of the tracked sites\u201413 under the Meta operator name and 9 under Meta Platforms\u2014establishing near-total control of deployed capacity in the parish. The market's power infrastructure reflects this concentration: all tracked capacity exists within a single operator ecosystem, with no recent deals recorded and no competing platforms establishing presence.\n\nThis combination\u2014adequate base supply paired with delivery bottlenecks\u2014creates a challenging environment for new facility siting.\n\nDeal flow in Richland Parish has stalled. The absence of competing operators or acquisition activity reflects the structural challenge: available power does not translate readily into usable capacity for new builds or operator diversification.", "slug": "richland-parish", "word_count": 256, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}