Power availability in Reno: DCPI verdict CAUTION, composite score 47.2 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 202 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
Reno has 175 MW operational, 281 MW under construction and 60 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are EdgeCore Digital Infrastructure (216 MW), PowerHouse Data Centers (65 MW) and Microsoft (60 MW).
| Status | MW |
|---|---|
| Operational | 175 |
| Under construction | 281 |
| Planned | 60 |
| Total listed | 516 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| EdgeCore Digital Infrastructure | 216 | |
| PowerHouse Data Centers | 65 | |
| Microsoft | 60 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: DC Hub estimate. Anchored on JLL North America Data Center Report Midyear 2025 (1-5 MW, H1 2025): Las Vegas/Reno combined (figure on paid plans)
The NV Energy-Tract lawsuit continues to draw media and transparency scrutiny, signaling ongoing tension around power procurement and grid access in the region.
The DCPI verdict of CAUTION reflects mixed signals on new power availability. This pairing—neither abundant nor severely restricted—means new power projects face neither straightforward access nor insurmountable barriers, but rather requires site-specific negotiation and timing discipline around NV Energy's capacity and network upgrades.
Deal flow in Reno remains minimal with no recent tracked transactions, yet operator concentration tells a different story. Switch's five-site footprint positions it as the dominant player, while Cogent Communications and Microsoft each operate two facilities.
Power procurement dynamics will remain the central variable shaping Reno's competitive position through 2026, particularly as the utility litigation resolves and construction projects reach operational phase.
| Facility | Operator | Status | MW |
|---|---|---|---|
| EdgeCore Reno Campus (TRIC) | EdgeCore Digital Infrastructure | Under Construction | 216 |
| PowerHouse Reno | PowerHouse Data Centers | Under Construction | 65 |
| Microsoft Silver Springs NV | Microsoft | Planned | 60 |
| Novva Tahoe Reno | Novva Data Centers | Operational | 60 |
| Edged Tahoe Reno 1 | Edged | Operational | 50 |
| EdgeCore Reno | EdgeCore | Operational | 45 |
| Tract Reno-1 | Tract | Operational | 20 |
| 200 South Virginia - Reno | Basin Street Properties | Operational | |
| CENTRA RNO01 - Reno Nevada (200 S. Virginia) | CENTRA Digital Interconnect | Operational | |
| Microsoft Silver Springs Nevada | Microsoft | Planned | |
| Roller Network (Reno, NV) | Roller Network LLC | Operational | |
| Switch Tahoe Reno - The Citadel Campus | Switch | Operational | |
| Switch Tahoe Reno Industrial | Switch | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Nevada.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Reno: 866 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/reno/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load