EdgeCore Reno Campus (TRIC)

EdgeCore Reno Campus (TRIC) is a data center operated by EdgeCore Digital Infrastructure in Reno, NV, US. Its reported power capacity falls in the 100–500 MW range and it is currently under construction.

Power
100–500 MW
Status
Under Construction
Market
Reno
State
NV
Country
US

Source: DC Hub facilities registry · Added , not re-checked since · Basis: cited (what this means)

Market intelligence

CAUTION

Reno

Power outlook → Reno market page →

Market context

EdgeCore Reno Campus (TRIC) is one of 63 facilities DC Hub’s Reno brief counts on the WECC grid. The closest tracked facility is Novva Tahoe Reno, about 5 km away, and the nearest mapped substation is within 5 km. Read the Reno market brief →

Location

Area Reno, NV, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationReno, US
Reported capacity100–500 MW
Nearest substationwithin 5 km

Power generation nearby

DC Hub tracks 31 operating generating units totalling 1,421 MW within about 50 km of Reno, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas1,151 MW · 6 units · 81%
Geothermal176 MW · 14 units · 12%
Utility-Scale Solar94 MW · 11 units · 7%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Unlock power scores for this site → Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="edgecore-digital-infrastructure-edgecore-reno-campus-tric-83051c40" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind