Power availability in Red Oak: DCPI verdict CAUTION, composite score 45 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 239 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
Red Oak has 750 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are DataBank (500 MW) and Compass Datacenters (250 MW).
| Status | MW |
|---|---|
| Under construction | 750 |
| Total listed | 750 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| DataBank | 500 | |
| Compass Datacenters | 250 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Red Oak hosts 805 MW across seven tracked facilities, with Compass operating three sites and DataBank, ALAMO MISSION, and Compass Datacenters each operating one. The market remains fragmented, with no recent transactions recorded in the tracking period. The operator landscape shows Compass maintaining the largest footprint, though the concentration remains modest relative to larger Texas metros.
In practical terms, new capacity can technically connect, but the path to energization will require careful navigation of bottlenecks that are not primarily driven by regional generation shortfalls.
Deal activity in Red Oak remains quiet. DataBank's broader acquisition strategy—evidenced by the Eagan transaction—suggests operator-level consolidation is occurring at a regional scale, though Red Oak-specific activity remains dormant. The presence of DataBank as a local operator positions the company to respond if market conditions shift, but current deal flow offers no signal of immediate expansion or repositioning.
| Facility | Operator | Status | MW |
|---|---|---|---|
| DataBank Red Oak Mega Campus | DataBank | Under Construction | 500 |
| Compass Red Oak Campus (Dallas) | Compass Datacenters | Under Construction | 250 |
| Compass Data Center | Compass | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Texas.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Red Oak: 805 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/red-oak/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load