DataBank Red Oak Mega Campus

DataBank Red Oak Mega Campus is a data center operated by DataBank in Red Oak, TX, US. Its reported power capacity falls in the 500 MW–1 GW range and it is currently under construction.

Power
500 MW–1 GW
Status
Under Construction
Market
Dallas
City
Red Oak
State
TX
Country
US

Source: DC Hub facilities registry · Added , not re-checked since · Basis: cited (what this means)

Market intelligence

CAUTION

Red Oak

Power outlook → Red Oak market page →

Market context

DataBank Red Oak Mega Campus is one of 7 facilities DC Hub’s Red Oak brief counts on the ERCOT grid. The closest tracked facility is Compass Datacenters Red Oak TX, about 5 km away, and the nearest mapped substation is within 5 km. Read the Red Oak market brief →

Location

Area Red Oak, TX, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationRed Oak, US
Reported capacity500 MW–1 GW
Nearest substationwithin 5 km

Fiber connectivity

Networks recorded as present at or immediately around DataBank Red Oak Mega Campus in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

DataBank

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 26 operating generating units totalling 7,902 MW within about 50 km of Red Oak, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas7,142 MW · 17 units · 90%
Utility-Scale Solar760 MW · 9 units · 10%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Unlock power scores for this site → Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="databank-databank-red-oak-mega-campus-ac4d3aca" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind