Power availability in Piscataway Township: DCPI verdict AVOID, composite score 22.5 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 231 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 22.7. The index is recomputed through the day and reads 22.5 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.
Piscataway Township has 28 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Digital Realty (28 MW).
| Status | MW |
|---|---|
| Operational | 28 |
| Total listed | 28 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Digital Realty operates 2 of these facilities, establishing the largest single operator presence in the market. The township's data center footprint remains small relative to regional peers, with total capacity well below 50 MW.
Taken together, these scores suggest that securing incremental megawatts for expansion or new builds will face headwinds from grid availability and procurement timelines. Site developers and operators planning capacity additions should expect extended utility coordination cycles and potential limitations on nameplate sizing.
No recent deals have been tracked in Piscataway Township, leaving operator composition stable around the Digital Realty anchor. Peer markets in New Jersey, including Bridgewater Township, operate fragmented facility portfolios across multiple operators, providing a template for how consolidation and diversification might eventually reshape Piscataway if new power infrastructure improves.
Grid relief or utility-led infrastructure investment would be required to materially improve the power procurement outlook for this market.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Digital Realty New York EWR11 | Digital Realty | Operational | 14 |
| Digital Realty New York EWR12 | Digital Realty | Operational | 14 |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in New Jersey.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Piscataway Township: 28 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/piscataway-township/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load