{"generated_at": "2026-11-07T09:17:59.949238+00:00", "key_stats": {"computed": "2026-11-07T08:48:05.205486+00:00", "constraint": null, "dcpi_score": 22.7, "excess": null, "facility_count": 4, "mw_reporting_count": 2, "name": "Piscataway Township", "recent_deals": [], "slug": "piscataway-township", "state": "NJ", "top_operators": [{"count": 2, "name": "Digital Realty"}, {"count": 1, "name": ""}, {"count": 1, "name": "Unknown"}], "total_mw": 28.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Piscataway Township", "narrative_md": "# Piscataway Township Data Center Market Brief\n\nPiscataway Township hosts 4 tracked facilities with a combined 28 MW across all operational, under-construction, and planned sites. Digital Realty operates 2 of these facilities, establishing the largest single operator presence in the market. The township's data center footprint remains small relative to regional peers, with total capacity well below 50 MW.\n\nTaken together, these scores suggest that securing incremental megawatts for expansion or new builds will face headwinds from grid availability and procurement timelines. Site developers and operators planning capacity additions should expect extended utility coordination cycles and potential limitations on nameplate sizing.\n\nNo recent deals have been tracked in Piscataway Township, leaving operator composition stable around the Digital Realty anchor. Peer markets in New Jersey, including Bridgewater Township, operate fragmented facility portfolios across multiple operators, providing a template for how consolidation and diversification might eventually reshape Piscataway if new power infrastructure improves.\n\nGrid relief or utility-led infrastructure investment would be required to materially improve the power procurement outlook for this market.", "slug": "piscataway-township", "word_count": 231, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}