Power availability in Paris: DCPI verdict AVOID, composite score 20.7 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 228 words · generated 2026-11-10 from live DC Hub data · DCPI live as of 2026-11-12
Paris has 304 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Equinix (113 MW), Interxion (75 MW) and Digital Realty (40 MW).
| Status | MW |
|---|---|
| Operational | 304 |
| Total listed | 304 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE Global Data Center Trends 2026, Figure 5 (Monthly Pricing for 250-to-500-kW Capacity by Market, Q1 2026): Paris (figure on paid plans) (link)
The market shows no recorded deal announcements in the current tracking cycle, though Digital Realty has initiated groundbreaking activity on a new Paris facility.
This combination places Paris in the AVOID category for new power procurement, meaning operators pursuing capacity expansion face material delays in grid connection timelines and heightened cost exposure for infrastructure upgrades needed to support additional demand.
Deal flow in Paris remains dormant with no recent transactions recorded. The operator landscape remains stable, with Equinix and Digital Reality commanding the largest footprints. Recent groundbreaking by Digital Reality signals active site-level development, and a separate announcement flagged a large Nvidia Blackwell deployment at a Global Switch Paris facility, though the end-user remains undisclosed.
Forward-looking, power grid co-location dynamics will remain the primary friction point for Paris data center expansion through 2027.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Equinix PA Campus | Equinix | Operational | 60 |
| Global Switch | Operational | 46 | |
| Interxion Paris | Digital Realty | Operational | 40 |
| Equinix PA4 | Equinix | Operational | 35 |
| Interxion PAR8 | Interxion | Operational | 30 |
| Interxion PAR7 | Interxion | Operational | 25 |
| Interxion PAR5 | Interxion | Operational | 20 |
| Equinix PA13X | Equinix | Operational | 18 |
| BNP Paribas Marne Sud | BNP Paribas | Operational | 5 |
| Datacenter EDF | EDF | Operational | 5 |
| Datacenter RTE | RTE | Operational | 5 |
| GTT | Operational | 5 | |
| Orange - Aubervilliers | Orange | Operational | 5 |
| nLighten France | Operational | 5 | |
| AWS EU West 3 (Paris) | Amazon Web Services | Operational | |
| Alphalink Telco Center | Operational | ||
| Azure France Central Paris | Microsoft | Operational | |
| Bouygues Telecom Montigny-le-Bretonneux | Bouygues Telecom | Operational | |
| Bâtiment Data Center | MBDA France | Operational | |
| Datacenter | SOCIETE TECHNOLOGIE EXPLOITATION INFORMATIQUE | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in France.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Paris: 356 MW tracked, any status — live, cited, and queryable by API or MCP.