{"generated_at": "2026-11-10T09:02:17.329187+00:00", "key_stats": {"computed": "2026-11-10T08:48:30.090826+00:00", "constraint": null, "dcpi_score": 20.7, "excess": null, "facility_count": 294, "mw_reporting_count": 16, "name": "Paris", "recent_deals": [], "slug": "paris", "state": "FR", "top_operators": [{"count": 15, "name": "Equinix"}, {"count": 11, "name": "Digital Realty"}, {"count": 7, "name": "Unknown"}, {"count": 6, "name": ""}, {"count": 6, "name": "Interxion Par"}], "total_mw": 356.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Paris", "narrative_md": "# Paris Data Center Market Brief\n\nParis hosts 294 tracked data center facilities across operational, under-construction, and planned sites, totaling 356 MW. Equinix leads the operator base with 15 facilities, followed by Digital Realty with 11 and Interxion Par with 6. The market shows no recorded deal announcements in the current tracking cycle, though Digital Realty has initiated groundbreaking activity on a new Paris facility.\n\nThis combination places Paris in the AVOID category for new power procurement, meaning operators pursuing capacity expansion face material delays in grid connection timelines and heightened cost exposure for infrastructure upgrades needed to support additional demand.\n\nDeal flow in Paris remains dormant with no recent transactions recorded. The operator landscape remains stable, with Equinix and Digital Reality commanding the largest footprints. Recent groundbreaking by Digital Reality signals active site-level development, and a separate announcement flagged a large Nvidia Blackwell deployment at a Global Switch Paris facility, though the end-user remains undisclosed.\n\nForward-looking, power grid co-location dynamics will remain the primary friction point for Paris data center expansion through 2027.", "slug": "paris", "word_count": 228, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}