Power availability in New Albany: DCPI verdict AVOID, composite score 17.9 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 209 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
New Albany has 100 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are STACK Infrastructure (100 MW).
| Status | MW |
|---|---|
| Under construction | 100 |
| Total listed | 100 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| STACK Infrastructure | 100 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
The market is dominated by hyperscalers and managed service providers, with Vantage operating 3 sites. These operators collectively represent the backbone of the region's capacity.
The DCPI verdict on power procurement is unambiguous: avoid. This combination reflects a market where available grid capacity is tight and power procurement costs face structural pressure. New capacity additions will encounter meaningful barriers to securing adequate supply commitments.
The absence of M&A activity or power purchase announcements stands in contrast to broader Ohio momentum, where hyperscalers continue expanding footprints in adjacent regions. Google, AWS, and Quality Technology Services maintain substantial deployed capacity, but the silence on new deal flow suggests either saturation of their current expansion plans in this specific geography or a pause in new site development pending grid relief.
| Facility | Operator | Status | MW |
|---|---|---|---|
| STACK New Albany OH | STACK Infrastructure | Under Construction | 100 |
| Amazon New Albany: Jug and Beach Road | Operational | ||
| Amazon Web Services CMH50 | Amazon Web Services | Operational | |
| Amazon Web Services CMH53 | Amazon Web Services | Operational | |
| Amazon Web Services CMH62 | Amazon Web Services | Operational | |
| Compugen New Albany | Operational | ||
| Google NBY-1 | Operational | ||
| Google NBY-5 | Operational | ||
| Google NBY-7 | Operational | ||
| Meta New Albany Data Center | Meta | Operational | |
| Meta New Albany Ohio | Meta | Operational | |
| QTS NAL 2 DC1 | QTS Realty | Operational | |
| QTS NAL 2 DC2 | Quality Technology Services | Operational | |
| QTS NAL1 DC1 | Quality Technology Services | Operational | |
| QTS NAL1 DC2 | QTS Realty | Operational | |
| TJX Corporate Techno | Operational | ||
| Vantage Building 1 | Vantage Data Centers | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Ohio.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
New Albany: 1,815 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/new-albany/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load