New Albany data center market

Power availability in New Albany: DCPI verdict AVOID, composite score 17.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 209 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score17.9/100
MW, all listings1,815sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

New Albany at a glance

New Albany has 100 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are STACK Infrastructure (100 MW).

Capacity by status, as of 2026-11-12
StatusMW
Under construction100
Total listed100

Developers building or planning in New Albany

OperatorUnder construction MWPlanned MW
STACK Infrastructure100

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in New Albany

DC Hub does not hold a lease-rate figure for this market yet.

The market is dominated by hyperscalers and managed service providers, with Vantage operating 3 sites. These operators collectively represent the backbone of the region's capacity.

The DCPI verdict on power procurement is unambiguous: avoid. This combination reflects a market where available grid capacity is tight and power procurement costs face structural pressure. New capacity additions will encounter meaningful barriers to securing adequate supply commitments.

The absence of M&A activity or power purchase announcements stands in contrast to broader Ohio momentum, where hyperscalers continue expanding footprints in adjacent regions. Google, AWS, and Quality Technology Services maintain substantial deployed capacity, but the silence on new deal flow suggests either saturation of their current expansion plans in this specific geography or a pause in new site development pending grid relief.

Data centers in New Albany

FacilityOperatorStatusMW
STACK New Albany OHSTACK InfrastructureUnder Construction100
Amazon New Albany: Jug and Beach RoadOperational
Amazon Web Services CMH50Amazon Web ServicesOperational
Amazon Web Services CMH53Amazon Web ServicesOperational
Amazon Web Services CMH62Amazon Web ServicesOperational
Compugen New AlbanyOperational
Google NBY-1GoogleOperational
Google NBY-5GoogleOperational
Google NBY-7GoogleOperational
Meta New Albany Data CenterMetaOperational
Meta New Albany OhioMetaOperational
QTS NAL 2 DC1QTS RealtyOperational
QTS NAL 2 DC2Quality Technology ServicesOperational
QTS NAL1 DC1Quality Technology ServicesOperational
QTS NAL1 DC2QTS RealtyOperational
TJX Corporate TechnoOperational
Vantage Building 1Vantage Data CentersOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Ohio.

More on New Albany

Email me when the New Albany DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

New Albany: 1,815 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/new-albany/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load