Vantage Building 1

Vantage Building 1 is a data center operated by Vantage Data Centers in New Albany, Ohio, US. The facility is currently operational.

Status
Operational
Market
Columbus
City
New Albany
State
Ohio
Country
US

Source: OpenStreetMap · Verified against OpenStreetMap · Basis: cited (what this means)

Market intelligence

AVOID

OHIO

Power outlook → OHIO market page →

Market context

Vantage Building 1 is one of 112 facilities DC Hub’s OHIO brief counts on the PJM grid. The closest tracked facility is Amazon New Albany: Jug and Beach Road, under 1 km away, and the nearest mapped substation is within 1 km. Read the OHIO market brief →

Location

Area New Albany, Ohio, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationNew Albany, US
Nearest substationwithin 1 km

Power generation nearby

DC Hub tracks 10 operating generating units totalling 767 MW within about 50 km of New Albany, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas564 MW · 6 units · 74%
Utility-Scale Solar203 MW · 4 units · 26%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Unlock power scores for this site → Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="vantage-data-centers-vantage-building-1-7f2cd2ed" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind