Mount Prospect data center market

Power availability in Mount Prospect: DCPI verdict AVOID, composite score 20.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 228 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score20.6/100
MW, all listings0any status, unverified listings included
VerdictAVOID

Colocation lease rates in Mount Prospect

DC Hub does not hold a lease-rate figure for this market yet.

Mount Prospect hosts four tracked facilities operated by a balanced roster of four providers—Apotech, Colocation America Corporation, DataBank, and Netrix LLC—with no dominant operator controlling multiple sites. No recent deals have been tracked in this market, and operator-level megawatt data is not available from current site reports.

The DCPI verdict of AVOID reflects the interaction of these two scores. For operators or tenants seeking to add load or expand footprint, the combination suggests that new power sourcing will require direct engagement with utility providers and may involve extended lead times or infrastructure upgrades beyond standard procurement timelines. The verdict does not reflect market demand or facility quality, but rather the practical difficulty of securing additional power supply in this specific geography.

Deal flow in Mount Prospect is dormant, with no transactions recorded in the tracked period. The four-operator structure—each with single-facility presence—suggests a fragmented market without recent consolidation or acquisition activity.

Data centers in Mount Prospect

FacilityOperatorStatusMW
ApotechOperational
CDC3 - 800 E Business Center DrColocation America CorporationOperational
DataBank Chicago (ORD3)DataBankOperational
NETRIX - MTPNetrix LLCOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Illinois.

More on Mount Prospect

Email me when the Mount Prospect DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Mount Prospect market data is live in DC Hub — cited and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/mount-prospect/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load