{"generated_at": "2026-11-07T09:13:15.944797+00:00", "key_stats": {"computed": "2026-11-07T08:48:23.155378+00:00", "constraint": null, "dcpi_score": 20.6, "excess": null, "facility_count": 4, "mw_reporting_count": 0, "name": "Mount Prospect", "recent_deals": [], "slug": "mount-prospect", "state": "IL", "top_operators": [{"count": 1, "name": "Apotech"}, {"count": 1, "name": "Colocation America Corporation"}, {"count": 1, "name": "DataBank"}, {"count": 1, "name": "Netrix LLC"}], "total_mw": 0.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Mount Prospect", "narrative_md": "# Mount Prospect Data Center Market Brief\n\nMount Prospect hosts four tracked facilities operated by a balanced roster of four providers\u2014Apotech, Colocation America Corporation, DataBank, and Netrix LLC\u2014with no dominant operator controlling multiple sites. No recent deals have been tracked in this market, and operator-level megawatt data is not available from current site reports.\n\nThe DCPI verdict of AVOID reflects the interaction of these two scores. For operators or tenants seeking to add load or expand footprint, the combination suggests that new power sourcing will require direct engagement with utility providers and may involve extended lead times or infrastructure upgrades beyond standard procurement timelines. The verdict does not reflect market demand or facility quality, but rather the practical difficulty of securing additional power supply in this specific geography.\n\nDeal flow in Mount Prospect is dormant, with no transactions recorded in the tracked period. The four-operator structure\u2014each with single-facility presence\u2014suggests a fragmented market without recent consolidation or acquisition activity.", "slug": "mount-prospect", "word_count": 228, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}