Mount Pleasant data center market

Power availability in Mount Pleasant: DCPI verdict CAUTION, composite score 49.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 264 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score49.3/100
MW, all listings4,500sum of the sites that report MW; some do notany status, unverified listings included
VerdictCAUTION

Mount Pleasant at a glance

Mount Pleasant has 3,300 MW under construction and 300 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Microsoft (3,600 MW).

Capacity by status, as of 2026-11-12
StatusMW
Under construction3,300
Planned300
Total listed3,600

Developers building or planning in Mount Pleasant

OperatorUnder construction MWPlanned MW
Microsoft3,300300

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Mount Pleasant

DC Hub does not hold a lease-rate figure for this market yet.

For operators and site developers, this means new power availability is not straightforward despite headline capacity.

Recent deal activity centered on Microsoft's $5M incentive arrangement with Mount Pleasant, which the company subsequently redirected back to the municipality rather than deployed as originally structured.

Data centers in Mount Pleasant

FacilityOperatorStatusMW
Microsoft Mount Pleasant AI CampusMicrosoftUnder Construction2,300
Microsoft Wisconsin AI CampusMicrosoftUnder Construction1,000
Microsoft Mount Pleasant WI Phase 2MicrosoftPlanned300
CMS Internet - DC1 - Mount Pleasant MICMS InternetOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Wisconsin.

More on Mount Pleasant

Email me when the Mount Pleasant DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Mount Pleasant: 4,500 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/mount-pleasant/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load