Power availability in Mount Pleasant: DCPI verdict CAUTION, composite score 49.3 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 264 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
Mount Pleasant has 3,300 MW under construction and 300 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Microsoft (3,600 MW).
| Status | MW |
|---|---|
| Under construction | 3,300 |
| Planned | 300 |
| Total listed | 3,600 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| Microsoft | 3,300 | 300 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
For operators and site developers, this means new power availability is not straightforward despite headline capacity.
Recent deal activity centered on Microsoft's $5M incentive arrangement with Mount Pleasant, which the company subsequently redirected back to the municipality rather than deployed as originally structured.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Microsoft Mount Pleasant AI Campus | Microsoft | Under Construction | 2,300 |
| Microsoft Wisconsin AI Campus | Microsoft | Under Construction | 1,000 |
| Microsoft Mount Pleasant WI Phase 2 | Microsoft | Planned | 300 |
| CMS Internet - DC1 - Mount Pleasant MI | CMS Internet | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Wisconsin.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Mount Pleasant: 4,500 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/mount-pleasant/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load