Microsoft Mount Pleasant WI Phase 2

Microsoft Mount Pleasant WI Phase 2 is a data center operated by Microsoft in Mount Pleasant, WI, US. Its reported power capacity falls in the 100–500 MW range and it is currently planned.

Power
100–500 MW
Status
Planned
Market
Mount Pleasant
State
WI
Country
US

Source: industry news · Added , not re-checked since · Basis: cited (what this means)

Market intelligence

CAUTION

Mount Pleasant

Power outlook → Mount Pleasant market page →

Market context

Microsoft Mount Pleasant WI Phase 2 is one of 10 facilities DC Hub’s Mount Pleasant brief counts on the MISO grid. The closest tracked facility is Microsoft Mount Pleasant AI Campus, about 1 km away, and the nearest mapped substation is within 5 km. Read the Mount Pleasant market brief →

Location

Area Mount Pleasant, WI, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationMount Pleasant, US
Reported capacity100–500 MW
Nearest substationwithin 5 km

Fiber connectivity

Networks recorded as present at or immediately around Microsoft Mount Pleasant WI Phase 2 in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Microsoft

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 34 operating generating units totalling 3,553 MW within about 50 km of Mount Pleasant, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Coal2,044 MW · 4 units · 58%
Oil/Gas1,249 MW · 9 units · 35%
Utility-Scale Solar257 MW · 19 units · 7%
Wind3 MW · 2 units · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Unlock power scores for this site → Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="microsoft-microsoft-mount-pleasant-wi-phase-2-2e632088" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind