Power availability in Madison: DCPI verdict CAUTION, composite score 49.8 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 228 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
DC Hub does not hold a lease-rate figure for this market yet.
The market has recorded no recent deal activity in the tracked registry. Local regulatory attention to data center deployment has intensified; proposed rules currently prohibit hyperscale facilities within city limits, and grid protection measures have been enacted in response to rising power demand from the sector.
This combination means new power procurement in Madison will face real but not severe barriers—grid interconnection timelines, utility coordination overhead, and potential need for localized infrastructure investment should be factored into facility planning.
Operator concentration remains low, with no single entity dominating; the largest tracked players each operate one facility. No recent transactions have been recorded in this market, making operator M&A flow or capacity consolidation patterns unobservable from current data.
Regulatory zoning restrictions on hyperscale deployment and documented grid protection actions will shape facility siting and power timeline assumptions for any new development pipeline.
| Facility | Operator | Status | MW |
|---|---|---|---|
| 5Nines Data | 5Nines Data / Network222 | Operational | |
| 612 W Main | Hoyos Consulting LLC | Operational | |
| EdgeConneX Madison (EDCMAD01) | EdgeConneX Inc. | Operational | |
| Lumen Madison 1 Data Center | Lumen Technologies | Operational | |
| Network 222 | Fiore Companies | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Wisconsin.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Madison market data is live in DC Hub — cited and queryable by API or MCP.
JSON: /api/v1/markets/madison/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load