{"generated_at": "2026-11-07T09:08:07.606140+00:00", "key_stats": {"computed": "2026-11-07T08:49:32.920779+00:00", "constraint": null, "dcpi_score": 49.8, "excess": null, "facility_count": 21, "mw_reporting_count": 0, "name": "Madison", "recent_deals": [], "slug": "madison", "state": "WI", "top_operators": [{"count": 1, "name": "5Nines Data / Network222"}, {"count": 1, "name": "Centurylink Madison"}, {"count": 1, "name": "EdgeConneX"}, {"count": 1, "name": "EdgeConneX Inc."}, {"count": 1, "name": ""}], "total_mw": 0.0, "verdict": "CAUTION"}, "model": "claude-haiku-4-5", "name": "Madison", "narrative_md": "# Madison Data Center Market Brief\n\nMadison operates 21 tracked facilities across four primary operators: 5Nines Data, Network222, CenturyLink Madison, and two EdgeConneX entities. The market has recorded no recent deal activity in the tracked registry. Local regulatory attention to data center deployment has intensified; proposed rules currently prohibit hyperscale facilities within city limits, and grid protection measures have been enacted in response to rising power demand from the sector.\n\nThis combination means new power procurement in Madison will face real but not severe barriers\u2014grid interconnection timelines, utility coordination overhead, and potential need for localized infrastructure investment should be factored into facility planning.\n\nOperator concentration remains low, with no single entity dominating; the largest tracked players each operate one facility. No recent transactions have been recorded in this market, making operator M&A flow or capacity consolidation patterns unobservable from current data.\n\nRegulatory zoning restrictions on hyperscale deployment and documented grid protection actions will shape facility siting and power timeline assumptions for any new development pipeline.", "slug": "madison", "word_count": 228, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}