Los Lunas data center market

Power availability in Los Lunas: DCPI verdict CAUTION, composite score 54.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 285 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score54.7/100
MW, all listings0any status, unverified listings included
VerdictCAUTION

Colocation lease rates in Los Lunas

DC Hub does not hold a lease-rate figure for this market yet.

Los Lunas is a nascent market with four tracked facilities and a power supply profile that requires caution. Meta operates two sites in the region, while GREATER KUDU operates a third tracked facility. The market has recorded no recent deal activity in the tracked registry. Site-level power reporting remains sparse, with only one of four tracked facilities submitting megawatt data to the knowledge base.

Together, these scores indicate that new power availability is not the primary barrier; rather, the pathway to grid connection and reliable delivery carries material risk.

Deal flow in Los Lunas remains dormant, with no recent transactions tracked. GREATER KUDU's single facility represents the only tracked third-party operator presence. This concentration reflects a market still in early infrastructure buildout, where large cloud providers are the primary decision-makers on capacity and timing. No third-party acquisition, sale, or investment activity has been recorded recently.

Regional context matters: New Mexico lawmakers have sought protections against data center power costs, and Google has publicly considered development in the state, though no Los Lunas-specific announcement has materialized. These signals suggest ongoing regulatory attention to power supply and pricing in the region, which may affect future expansion calculus for any operator.

Data centers in Los Lunas

FacilityOperatorStatusMW
MetaOperational
Meta Los Lunas Data CenterMetaOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in New Mexico.

More on Los Lunas

Email me when the Los Lunas DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Los Lunas market data is live in DC Hub — cited and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/los-lunas/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load