{"generated_at": "2026-11-07T09:07:43.803393+00:00", "key_stats": {"computed": "2026-11-07T08:48:08.694635+00:00", "constraint": null, "dcpi_score": 54.7, "excess": null, "facility_count": 4, "mw_reporting_count": 0, "name": "Los Lunas", "recent_deals": [], "slug": "los-lunas", "state": "NM", "top_operators": [{"count": 2, "name": "Meta"}, {"count": 1, "name": "GREATER KUDU - LOS LUNAS FACILITY"}], "total_mw": 0.0, "verdict": "CAUTION"}, "model": "claude-haiku-4-5", "name": "Los Lunas", "narrative_md": "# Los Lunas Data Center Market Brief\n\nLos Lunas is a nascent market with four tracked facilities and a power supply profile that requires caution. Meta operates two sites in the region, while GREATER KUDU operates a third tracked facility. The market has recorded no recent deal activity in the tracked registry. Site-level power reporting remains sparse, with only one of four tracked facilities submitting megawatt data to the knowledge base.\n\nTogether, these scores indicate that new power availability is not the primary barrier; rather, the pathway to grid connection and reliable delivery carries material risk.\n\nDeal flow in Los Lunas remains dormant, with no recent transactions tracked. GREATER KUDU's single facility represents the only tracked third-party operator presence. This concentration reflects a market still in early infrastructure buildout, where large cloud providers are the primary decision-makers on capacity and timing. No third-party acquisition, sale, or investment activity has been recorded recently.\n\nRegional context matters: New Mexico lawmakers have sought protections against data center power costs, and Google has publicly considered development in the state, though no Los Lunas-specific announcement has materialized. These signals suggest ongoing regulatory attention to power supply and pricing in the region, which may affect future expansion calculus for any operator.", "slug": "los-lunas", "word_count": 285, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}