Lisbon data center market

Power availability in Lisbon: DCPI verdict AVOID, composite score 16.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 251 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score16.8/100
MW, all listings10sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Lisbon at a glance

Lisbon has 10 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are NOS (10 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational10
Total listed10

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Lisbon

DC Hub does not hold a lease-rate figure for this market yet.

Equinix operates three sites, while NOS maintains two. Claranet Lisbon, Dotsi Unipessoal Lda., and Colt Technology Services each run one facility. The operator base remains fragmented, with no single player commanding dominant supply position.

Together these scores indicate that operators seeking to expand or acquire sites should expect elevated costs and extended procurement timelines for incremental power.

No recent deals have been tracked in Lisbon, leaving the current transaction environment opaque. Elsewhere in Portugal, NxN has moved into the market through acquisition activity centered on Évora and backed by €100 million in planned investment. Global platforms including Digital Realty have signaled entry into Lisbon, with reported focus on subsea cable infrastructure. These announcements suggest competitive interest in the metro region, yet the absence of closed Lisbon transactions indicates deals remain in negotiation or permitting phases.

Lisbon's tight power position and shallow deal flow suggest patience will remain necessary for market participants. The 10 MW footprint is modest relative to competing European metros, and power availability will likely remain the primary development variable over the near term.

Data centers in Lisbon

FacilityOperatorStatusMW
NOS Imopolis INOSOperational5
NOS Imopolis IINOSOperational5
Equinix LS1 - LisbonEquinixOperational
ONI Telecom Lisbon MatinhaOniTelecomOperational
Seixal Colocation SiteTATA CommunicationsOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Portugal.

More on Lisbon

Email me when the Lisbon DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Lisbon: 10 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/lisbon/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load