{"generated_at": "2026-11-07T09:07:21.179558+00:00", "key_stats": {"computed": "2026-11-07T08:49:16.364365+00:00", "constraint": null, "dcpi_score": 16.8, "excess": null, "facility_count": 33, "mw_reporting_count": 2, "name": "Lisbon", "recent_deals": [], "slug": "lisbon", "state": "PT", "top_operators": [{"count": 3, "name": "Equinix"}, {"count": 2, "name": "NOS"}, {"count": 1, "name": "Claranet Lisbon"}, {"count": 1, "name": "Dotsi, Unipessoal Lda."}, {"count": 1, "name": "Colt Technology Services Lisbon"}], "total_mw": 10.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Lisbon", "narrative_md": "# Lisbon Data Center Market Brief\n\nLisbon's tracked footprint stands at 33 facilities totaling 10 MW across all phases. Equinix operates three sites, while NOS maintains two. Claranet Lisbon, Dotsi Unipessoal Lda., and Colt Technology Services each run one facility. The operator base remains fragmented, with no single player commanding dominant supply position.\n\nTogether these scores indicate that operators seeking to expand or acquire sites should expect elevated costs and extended procurement timelines for incremental power.\n\nNo recent deals have been tracked in Lisbon, leaving the current transaction environment opaque. Elsewhere in Portugal, NxN has moved into the market through acquisition activity centered on \u00c9vora and backed by \u20ac100 million in planned investment. Global platforms including Digital Realty have signaled entry into Lisbon, with reported focus on subsea cable infrastructure. These announcements suggest competitive interest in the metro region, yet the absence of closed Lisbon transactions indicates deals remain in negotiation or permitting phases.\n\nLisbon's tight power position and shallow deal flow suggest patience will remain necessary for market participants. The 10 MW footprint is modest relative to competing European metros, and power availability will likely remain the primary development variable over the near term.", "slug": "lisbon", "word_count": 251, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}