Power availability in Grand Rapids: DCPI verdict CAUTION, composite score 45.9 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 262 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 45.8. The index is recomputed through the day and reads 45.9 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.
Grand Rapids has 10 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are US Signal (10 MW).
| Status | MW |
|---|---|
| Operational | 10 |
| Total listed | 10 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
The dual metric reflects a market where generation exists but infrastructure bottlenecks are beginning to bite.
New power procurement here will face friction—not gridlock, but meaningful obstacles.
No recent deals are tracked in Grand Rapids. The operator base is fragmented: US Signal holds two sites, Switch operates two, and Involta, MI GRR LLC, and Iserv Grand Rapids each operate one. This ownership structure means no single player dominates—a condition that typically supports transactional activity, yet none is recorded.
Operators planning capacity additions or new site development should model for extended power interconnection timelines and engage grid operators and municipal stakeholders early.
| Facility | Operator | Status | MW |
|---|---|---|---|
| US Signal Grand Rapids | US Signal | Operational | 10 |
| Switch The Keep Grand Rapids | Switch | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Michigan.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Grand Rapids: 130 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/grand-rapids/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load