Power availability in Goose Creek: DCPI verdict AVOID, composite score 28.6 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 191 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
Goose Creek has 200 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Google (200 MW).
| Status | MW |
|---|---|
| Operational | 200 |
| Total listed | 200 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Goose Creek's data center footprint is minimal and opaque. One tracked facility operates in the market; its operator is Google. Beyond this single site, visibility into capacity, headcount, or infrastructure density remains limited. The market shows no recent deal activity on record.
The DCPI verdict of AVOID reflects a precarious power position. Together, these readings indicate that sourcing new power here will require longer lead times, higher interconnection costs, or both. This is not a statement about market desirability but a direct measure of grid access friction.
Deal flow is absent. No transactions have been tracked in Goose Creek in the current window. The single operator presence—Google—provides no read on competitive dynamics or consolidation appetite.
New entrants or expansions should model extended utility coordination windows into site economics.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Google Berkeley County Data Center | Operational | 200 |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in South Carolina.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Goose Creek: 200 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/goose-creek/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load