{"generated_at": "2026-11-07T05:25:56.750519+00:00", "key_stats": {"computed": "2026-11-07T05:20:20.485813+00:00", "constraint": null, "dcpi_score": 28.6, "excess": null, "facility_count": 1, "mw_reporting_count": 1, "name": "Goose Creek", "recent_deals": [], "slug": "goose-creek", "state": "SC", "top_operators": [{"count": 1, "name": "Google"}], "total_mw": 200.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Goose Creek", "narrative_md": "# Goose Creek Power & Supply Brief\n\nGoose Creek's data center footprint is minimal and opaque. One tracked facility operates in the market; its operator is Google. Beyond this single site, visibility into capacity, headcount, or infrastructure density remains limited. The market shows no recent deal activity on record.\n\nThe DCPI verdict of AVOID reflects a precarious power position. Together, these readings indicate that sourcing new power here will require longer lead times, higher interconnection costs, or both. This is not a statement about market desirability but a direct measure of grid access friction.\n\nDeal flow is absent. No transactions have been tracked in Goose Creek in the current window. The single operator presence\u2014Google\u2014provides no read on competitive dynamics or consolidation appetite.\n\nNew entrants or expansions should model extended utility coordination windows into site economics.", "slug": "goose-creek", "word_count": 191, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}