Goodyear data center market

Power availability in Goodyear: DCPI verdict BUILD, composite score 67.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 250 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score67.7/100
MW, all listings1,260sum of the sites that report MW; most do notany status, unverified listings included
VerdictBUILD

Goodyear at a glance

Goodyear has 454 MW operational and 212 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Vantage Data Centers (304 MW), Compass Datacenters (212 MW) and Microsoft (150 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational454
Under construction212
Total listed666

Developers building or planning in Goodyear

OperatorUnder construction MWPlanned MW
Compass Datacenters212

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Goodyear

DC Hub does not hold a lease-rate figure for this market yet.

Three operators—Microsoft, Vantage (6), and Vantage Data Centers (5)—dominate the deployed and pipeline base.

The DCPI verdict of BUILD reflects favorable conditions for new power provisioning. This combination suggests the market can absorb greenfield power development without severe interconnection delays or costly backbone upgrades. New facilities entering Goodyear will encounter neither acute scarcity nor abundant spare capacity—the profile supports incremental build activity without requiring major grid reinforcement ahead of operations.

Deal flow in Goodyear remains inactive on the tracked record, with no recent acquisitions or asset transfers logged. Operator concentration remains high; the three leading entities control two-thirds of the tracked base. This static deal environment reflects either equilibrium in the current footprint or a lull between transaction windows. Vantage's multi-entity presence (operating both under the Vantage and Vantage Data Centers banners) underscores how single operators structure multiple legal entities across a single geography. The absence of recent deal activity does not signal market weakness—it indicates operators are provisioning capacity through organic growth rather than M&A.

Goodyear's power and supply dynamics remain oriented toward new-build deployment over the near term.

Data centers in Goodyear

FacilityOperatorStatusMW
Compass Goodyear Campus (Phoenix)Compass DatacentersUnder Construction212
Vantage Phoenix CampusVantage Data CentersOperational200
Microsoft West RegionMicrosoftOperational150
Vantage Phoenix V1Vantage Data CentersOperational56
Vantage Phoenix V2Vantage Data CentersOperational48
PHX-10MicrosoftOperational
PHX-12MicrosoftOperational
PHX-13MicrosoftOperational
PHX-14MicrosoftOperational
Stream Data Centers - Phoenix IStream Data CentersOperational
Stream Data Centers PHX-1Operational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Arizona.

More on Goodyear

Email me when the Goodyear DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Goodyear: 1,260 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/goodyear/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load