Goodyear data center market brief

Live · 0.1h fresh

Market Brief · BUILDDCPI score pending · Live as of 75% live coverage · 6/8 sections

At a Glance 2 of 3 KPIs live

Operational1,799 MWsum of the sites that report MW; most do not
Pipeline308 MW
FacilitiesGlobal facility map
Queue WaitNot tracked
Top OperatorMicrosoft

Power & Grid 3 of 5 metrics live

ISOWECC
Queue Capacity13,740 MW
Queue WaitNot tracked
Reserve Margin20.0%
Gen Additions 12mo4,641 MW
Interconnect PendingNot tracked

Pipeline 3 projects tracked

OperatorFacilityPowerStatusETA
Compass DatacentersCompass Goodyear Campus (Phoenix)212 MWUnder ConstructionNot tracked
Novva Data CentersNovva Project Borealis Phase 196 MWUnder ConstructionNot tracked
Arcadian InfracomArcadian Infracom Phoenix PoPNot trackedUnder ConstructionNot tracked

Operator Footprint 5 operators tracked

OperatorFacilitiesTotal MW
Microsoft7150 MW
Vantage6449 MW
Vantage Data Centers5449 MW
Compass Datacenters1212 MW
Compass10 MW

M&A Activity (24mo) Coverage building

Coverage building for M&A activity (24mo)
We will surface live M&A activity (24mo) data here as soon as our deals-tracker crawl returns rows for Goodyear. Full coverage typically lands within ~6 months of a market joining the DCPI.

Comps Coverage building

Coverage building for powered-shell and land comps
We will surface live powered-shell and land comps data here as soon as our transaction-tracker crawl returns rows for Goodyear. Full coverage typically lands within ~6 months of a market joining the DCPI.

Risk Factors 1 of 2 signals live

12-Month Outlook

Goodyear hosts 25 tracked facilities representing 1,260 MW across operational, under-construction, and planned stages, with Microsoft and Vantage entities operating the largest footprints. Three operators—Microsoft (7 facilities), Vantage (6), and Vantage Data Centers (5)—dominate the deployed and pipeline base.

The DCPI verdict of BUILD reflects favorable conditions for new power provisioning. This combination suggests the market can absorb greenfield power development without severe interconnection delays or costly backbone upgrades. New facilities entering Goodyear will encounter neither acute scarcity nor abundant spare capacity—the profile supports incremental build activity without requiring major grid reinforcement ahead of operations.

Deal flow in Goodyear remains inactive on the tracked record, with no recent acquisitions or asset transfers logged. Operator concentration remains high; the three leading entities control two-thirds of the tracked base. This static deal environment reflects either equilibrium in the current footprint or a lull between transaction windows. Vantage's multi-entity presence (operating both under the Vantage and Vantage Data Centers banners) underscores how single operators structure multiple legal entities across a single geography. The absence of recent deal activity does not signal market weakness—it indicates operators are provisioning capacity through organic growth rather than M&A.

Goodyear's power and supply dynamics remain oriented toward new-build deployment over the near term.

Share on X Share on LinkedIn Copy URL Embed this brief Download PDF
DC Hub · https://dchub.cloud/markets/goodyear/brief · Live as of