Power availability in Garden City: DCPI verdict CAUTION, composite score 49.4 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 244 words · generated 2026-11-06 from live DC Hub data · DCPI live as of 2026-11-12
Garden City has 100 MW operational and 100 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Applied Digital (200 MW).
| Status | MW |
|---|---|
| Operational | 100 |
| Under construction | 100 |
| Total listed | 200 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| Applied Digital | 100 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Applied Digital operates two sites in the market, with a third facility at 1101 Stewart Ave and Webair holding a fourth location. The operator base remains concentrated, with no recent deal activity recorded in the market through the tracking period.
This combination suggests that while raw power may exist in the region, the pathway to activating it carries elevated execution risk and likely extended timelines for new projects seeking to come online.
No recent deals have been tracked in Garden City, leaving operator composition stable but fragmented. Applied Digital's dual-site presence establishes it as the market anchor, though the single-facility operators—Webair and the 1101 Stewart Ave entity—maintain meaningful stakes. The absence of M&A or capacity transactions over the analyzed period indicates neither consolidation pressure nor acquisition competition has reshaped the market's ownership structure. Broader sector activity, including large-scale platform acquisitions and strategic facility development elsewhere, has not translated into recorded transaction flow in Garden City specifically.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Applied Digital Garden City | Applied Digital | Operational | 100 |
| Applied Digital Garden City KS | Applied Digital | Under Construction | 100 |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Kansas.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Garden City: 200 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/garden-city/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-06, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load