Applied Digital Garden City is a data center operated by Applied Digital in Garden City, TX, US. Its reported power capacity falls in the 100–500 MW range and it is currently operational.
Source: third-party directory · Added , not re-checked since · Basis: estimated (what this means)
Applied Digital Garden City is one of 5 facilities DC Hub’s Abilene brief counts on the ERCOT grid. Read the Abilene market brief →
Exact location not on record.
Published DC Hub data for this location.
Tracked by DC Hub in Garden City.
get_facility slug="applied-digital-applied-digital-garden-city-e6115cea" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect