Power availability in Ellendale: DCPI verdict AVOID, composite score 33.4 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 228 words · generated 2026-11-12 from live DC Hub data · DCPI live as of 2026-11-12
Ellendale has 100 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Applied Digital (100 MW).
| Status | MW |
|---|---|
| Operational | 100 |
| Total listed | 100 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Ellendale hosts 475 MW across five tracked facilities, anchored by Applied Digital's five sites. The market's infrastructure reflects recent capacity expansion—Applied Digital added 75 MW at its campus, bringing that footprint to 250 MW across multiple buildings. A separate data center facility has requested annexation into the municipality, signaling real estate integration with local governance. The geography remains concentrated, with no secondary operators visible in the tracked asset base.
Deal flow in Ellendale remains sparse. No recent transactions are tracked in the dataset, and the operator base shows minimal diversification. Applied Digital's dominant position across five facilities suggests a single-operator market with limited M&A activity or competitive entry recorded in the tracked period.
Power procurement will likely remain the primary variable shaping future development in Ellendale.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Applied Digital Ellendale | Applied Digital | Operational | 100 |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in North Dakota.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Ellendale: 475 MW tracked, any status — live, cited, and queryable by API or MCP.