{"generated_at": "2026-11-12T05:24:52.191821+00:00", "key_stats": {"computed": "2026-11-12T05:20:03.291498+00:00", "constraint": null, "dcpi_score": 33.4, "excess": null, "facility_count": 5, "mw_reporting_count": 3, "name": "Ellendale", "recent_deals": [], "slug": "ellendale", "state": "ND", "top_operators": [{"count": 5, "name": "Applied Digital"}], "total_mw": 475.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Ellendale", "narrative_md": "# Ellendale Data Center Market Brief\n\nEllendale hosts 475 MW across five tracked facilities, anchored by Applied Digital's five sites. The market's infrastructure reflects recent capacity expansion\u2014Applied Digital added 75 MW at its campus, bringing that footprint to 250 MW across multiple buildings. A separate data center facility has requested annexation into the municipality, signaling real estate integration with local governance. The geography remains concentrated, with no secondary operators visible in the tracked asset base.\n\nDeal flow in Ellendale remains sparse. No recent transactions are tracked in the dataset, and the operator base shows minimal diversification. Applied Digital's dominant position across five facilities suggests a single-operator market with limited M&A activity or competitive entry recorded in the tracked period.\n\nPower procurement will likely remain the primary variable shaping future development in Ellendale.", "slug": "ellendale", "word_count": 228, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}