Edison data center market

Power availability in Edison: DCPI verdict AVOID, composite score 22.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 190 words · generated 2026-11-09 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score22.8/100
MW, all listings0any status, unverified listings included
VerdictAVOID

This analysis was written on 2026-11-09, when the Data Center Power Index for this market read 23.0. The index is recomputed through the day and reads 22.8 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

Colocation lease rates in Edison

DC Hub does not hold a lease-rate figure for this market yet.

Power capacity data is limited; only one tracked site has reported megawatt figures to DC Hub. The operator base is highly concentrated, with Iron Mountain entities accounting for two of the three named operators in the market.

The DCPI verdict flags Edison as a site to avoid for new power development. Together, these metrics reflect a market where additional power procurement for new or expanded facilities will face friction.

Recent deal activity in Edison is not tracked by DC Hub. However, no transaction flow is visible in Edison specifically during the tracked period.

Data centers in Edison

FacilityOperatorStatusMW
Iron Mountain Data Center - New Jersey (NJE-1)Iron Mountain Data CentersOperational
Iron Mountain NJ1 EdisonIron MountainOperational
NJ 1 DATA CENTER

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in New Jersey.

More on Edison

Email me when the Edison DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Edison market data is live in DC Hub — cited and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/edison/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-09, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load