Power availability in East Wenatchee: DCPI verdict CAUTION, composite score 47.2 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 261 words · generated 2026-11-09 from live DC Hub data · DCPI live as of 2026-11-12
DC Hub does not hold a lease-rate figure for this market yet.
No single operator commands the market; the three tracked sites represent known deployments, though full market capacity remains unreported. This distributed ownership structure contrasts with highly concentrated markets elsewhere in the region and creates multiple stakeholders in local infrastructure decisions.
The DCPI verdict of CAUTION reflects a market sitting at an inflection point on power availability. Together, these scores suggest that new projects are feasible but will face real execution challenges: grid connections, utility coordination, or local permitting bottlenecks are plausible friction points, not theoretical ones. Sites already in operation have power; the question is whether the utility backbone and interconnection pathways can handle incremental load economically and on reasonable timelines.
No recent deals have been tracked in East Wenatchee, which means no announced new deployments, expansions, or capacity additions are on record. This silence does not indicate market weakness or stalled interest; it reflects current deal flow. The operator base remains stable and diversified, reducing single-point risk but also distributing decision-making across competing entities.
Forward momentum in the Wenatchee region will likely depend on utility-side power provisioning and whether new generation or transmission capacity reaches East Wenatchee over the near term.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Actapio | Operational | ||
| Intergate Columbia A | Sabey Data Centers | Operational | |
| Microsoft EAT03 | Microsoft | Operational | |
| Microsoft EAT04 | Microsoft | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Washington.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
East Wenatchee market data is live in DC Hub — cited and queryable by API or MCP.
JSON: /api/v1/markets/east-wenatchee/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-09, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load