{"generated_at": "2026-11-09T05:24:55.487107+00:00", "key_stats": {"computed": "2026-11-09T05:15:51.884875+00:00", "constraint": null, "dcpi_score": 47.2, "excess": null, "facility_count": 25, "mw_reporting_count": 0, "name": "East Wenatchee", "recent_deals": [], "slug": "east-wenatchee", "state": "WA", "top_operators": [{"count": 9, "name": "Unknown"}, {"count": 5, "name": ""}, {"count": 3, "name": "Sabey Data Centers"}, {"count": 3, "name": "Microsoft"}, {"count": 1, "name": "EAT14"}], "total_mw": 0.0, "verdict": "CAUTION"}, "model": "claude-haiku-4-5", "name": "East Wenatchee", "narrative_md": "# East Wenatchee Data Center Market Brief\n\nEast Wenatchee operates 25 tracked facilities under fragmented operator control, with Sabey Data Centers and Microsoft each running three sites and EAT14 operating one tracked location. No single operator commands the market; the three tracked sites represent known deployments, though full market capacity remains unreported. This distributed ownership structure contrasts with highly concentrated markets elsewhere in the region and creates multiple stakeholders in local infrastructure decisions.\n\nThe DCPI verdict of CAUTION reflects a market sitting at an inflection point on power availability. Together, these scores suggest that new projects are feasible but will face real execution challenges: grid connections, utility coordination, or local permitting bottlenecks are plausible friction points, not theoretical ones. Sites already in operation have power; the question is whether the utility backbone and interconnection pathways can handle incremental load economically and on reasonable timelines.\n\nNo recent deals have been tracked in East Wenatchee, which means no announced new deployments, expansions, or capacity additions are on record. This silence does not indicate market weakness or stalled interest; it reflects current deal flow. The operator base remains stable and diversified, reducing single-point risk but also distributing decision-making across competing entities.\n\nForward momentum in the Wenatchee region will likely depend on utility-side power provisioning and whether new generation or transmission capacity reaches East Wenatchee over the near term.", "slug": "east-wenatchee", "word_count": 261, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}