Power availability in Dallas (Dallas-Fort Worth): DCPI verdict CAUTION, composite score 42 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 298 words · generated 2026-11-09 from live DC Hub data · DCPI live as of 2026-11-12
Dallas has 2,166 MW operational, 1,375 MW under construction and 1,095 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are DataBank (582 MW), Yondr Group (550 MW) and CoreWeave (430 MW).
| Status | MW |
|---|---|
| Operational | 2,166 |
| Under construction | 1,375 |
| Planned | 1,095 |
| Total listed | 4,636 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| Yondr Group | 550 | |
| DataBank | 500 | |
| Anthropic / Fluidstack | 300 | |
| Compass Datacenters | 250 | |
| Crow Holdings | 245 | |
| PowerHouse Data Centers | 201 | |
| CoreWeave | 200 | |
| Compass | 96 | |
| Edged | 80 | |
| QTS | 48 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Dallas-Ft. Worth (figure on paid plans) (link)
The market's operator base remains concentrated among five players—DataBank (16 sites), Digital Realty (14), Equinix (14), Flexential (11), and Aligned (8)—though recent activity shows expansion beyond this core. Flexential has acquired 110 acres outside Dallas for a 108 MW data center campus, while KIDZ AI committed $44.6 M in announced investment tied to data center capacity.
This combination means new facilities can be sited and built, but power procurement will require active coordination with utility providers and grid operators.
Deal flow in Dallas shows mixed signals. Announced commitments remain thin—KIDZ AI's $44.6 M investment and the Northampton Capital Partners / Provident Data Centers joint venture represent the only recent tracked transactions—suggesting either a pause in formal M&A or a shift toward build-to-suit and lease structures not yet reflected in announced deals. Flexential's 110-acre acquisition for greenfield development indicates incumbent operators are still pursuing land banks and capacity expansion, even as headline deal volume remains subdued. The concentration of sites among five operators underscores structural market dynamics: entry and scaling still depend on either acquisition of existing portfolios or capital-intensive ground-up development.
Power supply dynamics will likely remain a negotiating point for any new capacity announcement in Dallas through 2027.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Yondr Lancaster (Dallas Campus) | Yondr Group | Planned | 550 |
| DataBank Red Oak Mega Campus | DataBank | Under Construction | 500 |
| Anthropic Texas AI Campus | Anthropic / Fluidstack | Planned | 300 |
| Tallgrass Denton DC | Tallgrass Energy | Operational | 260 |
| Compass Red Oak Campus (Dallas) | Compass Datacenters | Under Construction | 250 |
| Crow Holdings / CleanArc - Stemmons Corridor | Crow Holdings | Planned | 245 |
| PowerHouse Irving (Las Colinas) | PowerHouse Data Centers | Under Construction | 201 |
| CoreWeave Helios TX (Core Scientific) | CoreWeave | Under Construction | 200 |
| CoreWeave Plano Campus | CoreWeave | Operational | 200 |
| QTS Irving Mega Campus | QTS | Operational | 200 |
| Aligned DFW Campus | Aligned | Operational | 150 |
| Digital Realty DFW Campus | Digital Realty | Operational | 150 |
| QTS Dallas | QTS | Operational | 130 |
| Compass DFW Campus | Compass | Operational | 120 |
| Equinix DA Campus | Equinix | Operational | 100 |
| Compass Allen TX-1 | Compass | Under Construction | 96 |
| Compass Dallas | Compass Datacenters | Operational | 80 |
| Edged Texas 1 | Edged | Under Construction | 80 |
| Stack Dallas | Stack Infrastructure | Operational | 70 |
| DataBank DFW | DataBank | Operational | 60 |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Texas.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Dallas: 7,017 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/dallas/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-09, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load