Power availability in Brandon: DCPI verdict AVOID, composite score 35.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 239 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score35.7/100
MW, all listings150every tracked site reports MWany status, unverified listings included
VerdictAVOID

Brandon at a glance

Brandon has 150 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are AVAIO Digital (150 MW).

Capacity by status, as of 2026-11-12
StatusMW
Under construction150
Total listed150

Developers building or planning in Brandon

OperatorUnder construction MWPlanned MW
AVAIO Digital150

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Brandon

DC Hub does not hold a lease-rate figure for this market yet.

Brandon's tracked data center footprint comprises a single facility operated by AVAIO Digital, with power capacity reported by only that one site. These readings place Brandon in the lowest quartile for power accessibility among actively monitored markets.

The DCPI verdict of AVOID reflects the power procurement environment specifically. This combination—tight current supply and difficult incremental procurement—creates unfavorable conditions for projects dependent on rapid or large-scale power additions.

Deal flow in Brandon remains dormant by registry count; no transactions have been tracked recently. The single tracked operator, AVAIO Digital, operates the market's only documented facility. The relevance and status of these references to Brandon's current tracked market state remains unclear from available sources.

Data centers in Brandon

FacilityOperatorStatusMW
AVAIO Digital Taurus (Brandon Campus)AVAIO DigitalUnder Construction150

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Mississippi.

More on Brandon

Email me when the Brandon DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Brandon: 150 MW tracked, any status — live, cited, and queryable by API or MCP.