AVAIO Digital Taurus (Brandon Campus)

AVAIO Digital Taurus (Brandon Campus) is a data center operated by AVAIO Digital in Brandon, MS, US. Its reported power capacity falls in the 100–500 MW range and it is currently under construction.

Power
100–500 MW
Status
Under Construction
Market
Brandon
State
MS
Country
US

Source: DC Hub facilities registry · Added , not re-checked since · Basis: cited (what this means)

Market intelligence

AVOID

Brandon

Power outlook → Brandon market page →

Market context

AVAIO Digital Taurus (Brandon Campus) is one of 1 facilities DC Hub’s Brandon brief counts on the MISO grid. The closest tracked facility is OSM DC 1430720172, about 37 km away, and the nearest mapped substation is within 5 km. Read the Brandon market brief →

Location

Area Brandon, MS, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationBrandon, US
Reported capacity100–500 MW
Nearest substationwithin 5 km

Power generation nearby

DC Hub tracks 5 operating generating units totalling 829 MW within about 50 km of Brandon, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas551 MW · 1 unit · 66%
Utility-Scale Solar278 MW · 4 units · 34%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Unlock power scores for this site → Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="avaio-digital-avaio-digital-taurus-brandon-campus-a48d5c7a" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind