Power availability in Zurich: DCPI verdict AVOID, composite score 19.7 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 257 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
Zurich has 50 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Vantage Data Centers (50 MW).
| Status | MW |
|---|---|
| Operational | 50 |
| Total listed | 50 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
The market is fragmented across multiple operators, with AtlasEdge and Init7 Winterthur each running two tracked facilities.
The DCPI verdict of AVOID reflects structural headwinds on the power supply side. Together, these readings suggest that operators seeking incremental power allocation face elevated competition for limited available supply. This combination creates a ceiling effect: new capacity additions will encounter genuine bottlenecks in securing grid connection slots and stable power feed agreements rather than abundant optionality.
Digital Realty announced a fourth data center in Zurich (ZUR4) with 15 MW of capacity, representing the only publicly tracked greenfield project in the region. The absence of recent acquisition or sale activity in Zurich contrasts with deal flow in adjacent Central European hubs, suggesting either market maturity or limited availability of operating assets at commercially viable terms. The operator roster shows no single dominant player, with the top five operators controlling only 15 of 91 tracked sites.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Vantage Zurich | Vantage Data Centers | Operational | 50 |
| AWS EU Central 2 (Zurich) | Amazon Web Services | Operational | |
| Azure Switzerland North Zurich | Microsoft | Operational | |
| Colt DCS Zurich | Colt DCS | Operational | |
| Equinix ZH5 - Zurich, South | Equinix | Operational | |
| Google Cloud europe-west6 Zurich | Operational | ||
| Oracle Cloud Switzerland Zurich | Oracle | Operational | |
| Vantage Zurich Switzerland | Vantage Data Centers | Operational | |
| colozüri.ch | NTS Colocation AG | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Switzerland.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Zurich: 110 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/zurich/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load