Williston, ND data center market

Power availability in Williston, ND: DCPI verdict BUILD, composite score 76.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 225 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score76.9/100
MW, all listings40sum of the sites that report MW; some do notany status, unverified listings included
VerdictBUILD

Williston, ND at a glance

Williston, ND has 40 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Crusoe Energy (40 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational40
Total listed40

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Williston, ND

DC Hub does not hold a lease-rate figure for this market yet.

Williston hosts two tracked data center facilities, with Crusoe Energy operating both sites. The market is early-stage infrastructure for compute, with documented municipal approval for expansion north of town and active public discourse around benefits and community impact.

This combination signals that new power supply capacity is available and procurement barriers are minimal.

Crusoe Energy's dual-site presence establishes operational continuity in the market, though no recent acquisition or facility deals have been tracked in Williston proper.

Williston's power profile remains permissive for build-out, with grid capacity and interconnection pathways supporting new deployments at current and near-term utilization levels.

Data centers in Williston, ND

FacilityOperatorStatusMW
Crusoe Energy North DakotaCrusoe EnergyOperational40

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in North Dakota.

More on Williston, ND

Email me when the Williston, ND DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Williston, ND: 40 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/williston-nd/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load