Tucson data center market

Power availability in Tucson: DCPI verdict BUILD, composite score 69.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 315 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score69.6/100
MW, all listings5sum of the sites that report MW; most do notany status, unverified listings included
VerdictBUILD

Tucson at a glance

Tucson has 5 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12.

Capacity by status, as of 2026-11-12
StatusMW
Operational5
Total listed5

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Tucson

DC Hub does not hold a lease-rate figure for this market yet.

Tucson hosts nine tracked data center facilities across five distinct operators, with CenturyLink Tucson, DirecTV, Involta Tucson, Login LLC, and Simply Bits LLC each maintaining a single site in the market. One facility publicly reports its power consumption, but aggregate capacity data for the market remains undisclosed. The operator base reflects a mix of regional and national providers without clear market concentration, suggesting a fragmented competitive landscape typical of secondary markets in the Southwest.

This combination signals that new power supply capacity is available and that regulatory, infrastructure, or contractual barriers to accessing that power remain modest.

No recent deals have been tracked in Tucson's data center market. The deal silence is consistent with a market in early- to mid-stage maturity, where operators maintain independent facilities without triggering major transactional events.

Tucson's regulatory environment is beginning to formalize data center governance; Oro Valley municipal proceedings have included discussion of new data center rules, and a 160-acre greenfield proposal in nearby Sahuarita is under public review. These signals suggest that municipal capacity planning and land-use policy around data center siting are active considerations for future development. Power and supply fundamentals remain the primary variable shaping feasibility for new or expanded operations in the market.

Data centers in Tucson

FacilityOperatorStatusMW
DirecTVOperational5
Login TucsonLogin, LLCOperational
Simply Bits DC1Simply Bits, LLCOperational
ark data centers - Tucson, AZark data centersOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Arizona.

More on Tucson

Email me when the Tucson DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Tucson: 5 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/tucson/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load