Power availability in Toronto: DCPI verdict AVOID, composite score 25.2 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 255 words · generated 2026-11-10 from live DC Hub data · DCPI live as of 2026-11-12
Toronto has 45 MW operational and 40 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Microsoft (40 MW), Yondr Group (27 MW) and Cologix (18 MW).
| Status | MW |
|---|---|
| Operational | 45 |
| Under construction | 40 |
| Total listed | 85 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| Microsoft | 40 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
This operator concentration reflects a mature, consolidated market where facility acquisition and portfolio integration have shaped the competitive structure. The market remains geographically and operationally centered on the city's established data center corridors.
These metrics suggest that new entrants or existing operators seeking significant expansion will face material obstacles in power acquisition rather than abundance.
Recent tracked deal activity in Toronto remains minimal, with no deals recorded in the current window. The Ontario government's new data center framework announcement suggests policy-level recognition of infrastructure gaps, though framework adoption and project execution typically lag announcement. Operator dynamics continue to reflect consolidation and asset optimization rather than aggressive new-build announcements.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Microsoft Vaughan Ontario | Microsoft | Under Construction | 40 |
| Yondr Toronto | Yondr Group | Operational | 27 |
| Cologix Toronto 1 | Cologix | Operational | 18 |
| Bell Toronto | Bell Canada (formally Group Telecom) | Operational | |
| Canada15Edge Data Center | Canada15Edge Data Centers | Operational | |
| Digital Realty YYZ12 Toronto (151 Front Street) | Digital Realty | Operational | |
| Rogers Data Center | Operational | ||
| Telehouse Toronto (151 Front St West) | Telehouse | Operational | |
| Telus | Operational | ||
| eStruxture TOR-2 | eStruxture Data Centers Inc. | Operational | |
| eStruxture TOR-4 | eStruxture Data Centers Inc. | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Canada.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).