Toronto data center market

Power availability in Toronto: DCPI verdict AVOID, composite score 25.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 255 words · generated 2026-11-10 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score25.2/100
MW, all listings705sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Toronto at a glance

Toronto has 45 MW operational and 40 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Microsoft (40 MW), Yondr Group (27 MW) and Cologix (18 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational45
Under construction40
Total listed85

Developers building or planning in Toronto

OperatorUnder construction MWPlanned MW
Microsoft40

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Toronto

DC Hub does not hold a lease-rate figure for this market yet.

This operator concentration reflects a mature, consolidated market where facility acquisition and portfolio integration have shaped the competitive structure. The market remains geographically and operationally centered on the city's established data center corridors.

These metrics suggest that new entrants or existing operators seeking significant expansion will face material obstacles in power acquisition rather than abundance.

Recent tracked deal activity in Toronto remains minimal, with no deals recorded in the current window. The Ontario government's new data center framework announcement suggests policy-level recognition of infrastructure gaps, though framework adoption and project execution typically lag announcement. Operator dynamics continue to reflect consolidation and asset optimization rather than aggressive new-build announcements.

Data centers in Toronto

FacilityOperatorStatusMW
Microsoft Vaughan OntarioMicrosoftUnder Construction40
Yondr TorontoYondr GroupOperational27
Cologix Toronto 1CologixOperational18
Bell TorontoBell Canada (formally Group Telecom)Operational
Canada15Edge Data CenterCanada15Edge Data CentersOperational
Digital Realty YYZ12 Toronto (151 Front Street)Digital RealtyOperational
Rogers Data CenterOperational
Telehouse Toronto (151 Front St West)TelehouseOperational
TelusOperational
eStruxture TOR-2eStruxture Data Centers Inc.Operational
eStruxture TOR-4eStruxture Data Centers Inc.Operational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Canada.

More on Toronto

Email me when the Toronto DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Toronto: 705 MW tracked, any status — live, cited, and queryable by API or MCP.