Tokyo data center market

Power availability in Tokyo: DCPI verdict AVOID, composite score 15.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 237 words · generated 2026-11-11 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score15.2/100
MW, all listings407sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Tokyo at a glance

Tokyo has 265 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are NTT (115 MW), Equinix (100 MW) and Digital Realty (50 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational265
Total listed265

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Tokyo

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE Global Data Center Trends 2026 (Q1 2026): average asking rent (figure on paid plans) (link)

The top five operators—Equinix (14 sites), NTT DOCOMO BUSINESS Data Centers (9), NTT-ME Data Centers (8), NTT (6), and Telehouse (6)—control substantial infrastructure but fragmentation remains: no single operator holds more than 3.5% of tracked capacity.

This combination signals tight power availability relative to demand; new capacity additions face supply-side friction from grid limitations and utility interconnection timelines. Sites considering expansion or entry should expect protracted power supply negotiation and potential delays in achieving full operational capacity.

Keppel DC REIT completed acquisition of two hyperscale colocation facilities in Tokyo for $1.2B, consolidating regional hyperscale presence. STTGDC secured $588M in debt financing (announced October 2026) for a 70 MW campus fit-out and operations. AirTrunk announced $1B equity investment in Japan (October 2026) alongside a parallel $1B development program for a campus in Inzai, signaling confidence in long-term regional expansion despite near-term power supply headwinds.

Data centers in Tokyo

FacilityOperatorStatusMW
Equinix TY CampusEquinixOperational100
NTT TokyoNTTOperational80
Digital Realty TKYDigital RealtyOperational50
NTT Tokyo 1NTTOperational35
@Tokyo Chuo Center (CC1 & CC2)Operational
AT TOKYO (CC1/CC2)AT TOKYO CorporationOperational
AWS AP Northeast 1 (Tokyo)Amazon Web ServicesOperational
Azure Japan East TokyoMicrosoftOperational
Equinix TY15 - TokyoEquinixOperational
Equinix TY2 - TokyoEquinixOperational
Equinix TY3 - TokyoEquinixOperational
Equinix TY6 - TokyoEquinixOperational
Equinix TY8 - TokyoEquinixOperational
Microsoft Azure Japan East (Tokyo)MicrosoftOperational
NTT DOCOMO BUSINESS TK1 - Tokyo (NTT Otemachi)NTT DOCOMO BUSINESS (Data Centers)Operational
NTT DOCOMO BUSINESS TK6 - TokyoNTT DOCOMO BUSINESS (Data Centers)Operational
NTT DOCOMO BUSINESS TK9 - TokyoNTT DOCOMO BUSINESS (Data Centers)Operational
NTT DATA Mitaka DataCenter EASTNTT DATA CORPORATIONOperational
NTT市川中山ビルNTT東日本Operational
Otemachi Place West Tower (BBTower Shin-Otemachi)BroadBand Tower, Inc.Operational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Japan.

More on Tokyo

Email me when the Tokyo DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Tokyo: 407 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/tokyo/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-11, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load