Power availability in Somerset: DCPI verdict AVOID, composite score 22 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 292 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 22.2. The index is recomputed through the day and reads 22.0 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.
DC Hub does not hold a lease-rate figure for this market yet.
Only one tracked facility publicly reports megawatt capacity, signaling opacity across the broader operational footprint. The operator base remains thin—beyond CyrusOne's dominance, Rackspace maintains a single tracked presence with its Belmont NYC2 facility.
The DCPI verdict reflects limited headroom for new power sourcing. Operators seeking to add capacity here should expect elevated grid interconnection timelines and higher marginal costs for power acquisition.
Deal flow has stalled entirely: no recent transactions are tracked in Somerset. The absence of named recent deals is consistent with operator focus on managing existing assets rather than pursuing growth through procurement.
Market evolution will depend on utility-side investment in transmission and generation serving the Somerset region; absent that infrastructure expansion, power scarcity will remain the primary limiting factor for the foreseeable future.
| Facility | Operator | Status | MW |
|---|---|---|---|
| BNY Mellon Somerset | Operational | ||
| CyrusOne NJ-1 | CyrusOne Inc. | Operational | |
| CyrusOne Somerset | CyrusOne | Operational | |
| Rackspace Belmont NYC2 | Operational | ||
| Rackspace Somerset NYC1 | Operational | ||
| Somerset, NJ, NYM1 | CyrusOne | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in New Jersey.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Somerset: 500 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/somerset/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load